For any emergencies or loss of supply, please call our free 24hr Telephone Number: +44 (0)800 055 6288

About Us

Harlaxton Energy Networks Limited are an Independent Distribution Network Operator (IDNO); we develop, operate and maintain electricity distribution networks across the UK.

For many people the distinction between an electricity supply company and an electricity distribution company is often blurred, which creates a degree of confusion. To put it simply, supply companies sell electricity, read meters and send out bills, whereas a distribution company own and look after the infrastructure; such as wires, poles, transformers and substations. Harlaxton Energy Networks Ltd (IDNO) provide a supply of electricity through a network of underground cabling and substations at LV and HV networks to domestic, commercial and industrial customers.

 

Customers should be advised our Safety and Security of Supplies Enquiry Service can be located under the Downloads section of the website.

                How You Benefit

    •  Independent licensed electricity distribution business.
    •  Able to work across all geographical areas of England, Scotland and Wales.
    •  Direct focus on excellent customer service.
    •  Working to the standards set by the Office of Gas and Electricity Markets (Ofgem)
    •  Incomparable levels of engineering safety.
 

Other Services

In addition to Harlaxton Energy Networks Ltd, our sister company Harlaxton Engineering Services are also specialists in multi utility supply, providing a comprehensive range of services that cover every aspect of design, supply, construction, connections, servicing and maintenance.

Download 

Priority Services Guidance Document

Download >>

Download 

Safety and Security of Supply Statement

Download

Download 

Coronavirus Update and FAQ’s

Download >>

Download 

Electricity Metering Manual of Procedure

Download >>

Download 

Business information for Meter Operators

Download >>

Download 

Commissioning of Distribution Business Provided Metering Facilities

Download >>

Download 

Statement of Methodology and Charges for Electricity Connections

Download >>

Download 

Statement of Charges for Metering Point Administration Services

Download

Download 

General Terms and Conditions for Connection

Download

Download 

Connection Offer Expenses Customer Guide

Download

Download 

Electricity Connection Charges Regulations

Download

Download

Distribution Flexibility Procurement Services Statement (SL31E) -April 2024

Download

Download

G98 Application form

Download

Download

Embedded Capacity Register

Download

Download

Statutory Changing Standards – Voltage Changes

Download

Download 
Harlaxton Use of System Charging Statement- 1st April 2025 – Final

Download

Download 

GSP A – Harlaxton 2025 April Final Charges

Download

Download 

GSP B – Harlaxton 2025 April Final Charges

Download

Download 

GSP C – Harlaxton 2025 April Final Charges

Download

Download 

GSP D – Harlaxton 2025 April Final Charges

Download

Download 

GSP E – Harlaxton 2025 April Final Charges

Download

Download 

GSP F – Harlaxton 2025 April Final Charges

Download

Download 

GSP G – Harlaxton 2025 April Final Charges

Download

Download 

GSP H – Harlaxton 2025 April Final Charges

Download

Download 

GSP J – Harlaxton 2025 April Final Charges

Download

Download 

GSP K – Harlaxton 2025 April Final Charges

Download

Download 

GSP L – Harlaxton 2025 April Final Charges

Download

Download 

GSP M – Harlaxton 2025 April Final Charges

Download

Download 

GSP N – Harlaxton 2025 April Final Charges

Download

Download 

GSP P – Harlaxton 2025 April Final Charges

Download

Download 
Harlaxton Use of System Charging Statement- 1st April 2024 – Final

Download

Download 

GSP A – Harlaxton 2024 April Final Charges

Download

Download 

GSP B – Harlaxton 2024 April Final Charges

Download

Download 

GSP C – Harlaxton 2024 April Final Charges

Download

Download 

GSP D – Harlaxton 2024 April Final Charges

Download

Download 

GSP E – Harlaxton 2024 April Final Charges

Download

Download 

GSP F – Harlaxton 2024 April Final Charges

Download

Download 

GSP G – Harlaxton 2024 April Final Charges

Download

Download 

GSP H – Harlaxton 2024 April Final Charges

Download

Download 

GSP J – Harlaxton 2024 April Final Charges

Download

Download 

GSP K – Harlaxton 2024 April Final Charges

Download

Download 

GSP L – Harlaxton 2024 April Final Charges

Download

Download 

GSP M – Harlaxton 2024 April Final Charges

Download

Download 

GSP N – Harlaxton 2024 April Final Charges

Download

Download 

GSP P – Harlaxton 2024 April Final Charges

Download

Download 
Harlaxton Use of System Charging Statement- 1st April 2023 – Final

Download

Download 

GSP A – Harlaxton 2023 April Final Charges

Download

Download 

GSP B – Harlaxton 2023 April Final Charges

Download

Download 

GSP C – Harlaxton 2023 April Final Charges

Download

Download 

GSP D – Harlaxton 2023 April Final Charges

Download

Download 

GSP E – Harlaxton 2023 April Final Charges

Download

Download 

GSP F – Harlaxton 2023 April Final Charges

Download

Download 

GSP G – Harlaxton 2023 April Final Charges

Download

Download 

GSP H – Harlaxton 2023 April Final Charges

Download

Download 

GSP J – Harlaxton 2023 April Final Charges

Download

Download 

GSP K – Harlaxton 2023 April Final Charges

Download

Download 

GSP L – Harlaxton 2023 April Final Charges

Download

Download 

GSP M – Harlaxton 2023 April Final Charges

Download

Download 

GSP N – Harlaxton 2023 April Final Charges

Download

Download 

GSP P – Harlaxton 2023 April Final Charges

Download

Download 
Harlaxton Use of System Charging Statement- 1st April 2022 – Final

Download

Download 

GSP A – Harlaxton 2022 April Final Charges

Download

Download 

GSP B – Harlaxton 2022 April Final Charges

Download

Download 

GSP C – Harlaxton 2022 April Final Charges

Download

Download 

GSP D – Harlaxton 2022 April Final Charges

Download

Download 

GSP E – Harlaxton 2022 April Final Charges

Download

Download 

GSP F – Harlaxton 2022 April Final Charges

Download

Download 

GSP G – Harlaxton 2022 April Final Charges

Download

Download 

GSP H – Harlaxton 2022 April Final Charges

Download

Download 

GSP J – Harlaxton 2022 April Final Charges

Download

Download 

GSP K – Harlaxton 2022 April Final Charges

Download

Download 

GSP L – Harlaxton 2022 April Final Charges

Download

Download 

GSP M – Harlaxton 2022 April Final Charges

Download

Download 

GSP N – Harlaxton 2022 April Final Charges

Download

Download 

GSP P – Harlaxton 2022 April Final Charges

Download

Download 
Harlaxton Use of System Charging Statement- 1st April 2021 – Final

Download

Download 

GSP A – Harlaxton 2021 April Final Charges

Download

Download 

GSP B – Harlaxton 2021 April Final Charges

Download

Download 

GSP C – Harlaxton 2021 April Final Charges

Download

Download 

GSP D – Harlaxton 2021 April Final Charges

Download

Download 

GSP E – Harlaxton 2021 April Final Charges

Download

Download 

GSP F – Harlaxton 2021 April Final Charges

Download

Download 

GSP G – Harlaxton 2021 April Final Charges

Download

Download 

GSP H – Harlaxton 2021 April Final Charges

Download

Download 

GSP J – Harlaxton 2021 April Final Charges

Download

Download 

GSP K – Harlaxton 2021 April Final Charges

Download

Download 

GSP L – Harlaxton 2021 April Final Charges

Download

Download 

GSP M – Harlaxton 2021 April Final Charges

Download

Download 

GSP N – Harlaxton 2021 April Final Charges

Download

Download 

GSP P – Harlaxton 2021 April Final Charges

Download

Download 
Harlaxton Use of System Charging Statement- 1st April 2020 – Final

Download

Download 

GSP A – Harlaxton 2020 April Final Charges

Download

Download 

GSP B – Harlaxton 2020 April Final Charges

Download

Download 

GSP C – Harlaxton 2020 April Final Charges

Download

Download 

GSP D – Harlaxton 2020 April Final Charges

Download

Download 

GSP E – Harlaxton 2020 April Final Charges

Download

Download 

GSP F – Harlaxton 2020 April Final Charges

Download

Download 

GSP G – Harlaxton 2020 April Final Charges

Download

Download 

GSP H – Harlaxton 2020 April Final Charges

Download

Download 

GSP J – Harlaxton 2020 April Final Charges

Download

Download 

GSP K – Harlaxton 2020 April Final Charges

Download

Download 

GSP L – Harlaxton 2020 April Final Charges

Download

Download 

GSP M – Harlaxton 2020 April Final Charges

Download

Download 

GSP N – Harlaxton 2020 April Final Charges

Download

Download 

GSP P – Harlaxton 2020 April Final Charges

Download

Download 

Harlaxton Use of System Charging Statement- 1st April 2019 – Final

Download

Download 

GSP A – Harlaxton 2019 April Final Charges

Download

Download 

GSP B – Harlaxton 2019 April Final Charges

Download

Download 

GSP C – Harlaxton 2019 April Final Charges

Download

Download 

GSP D- Harlaxton 2019 April Final Charges

Download

Download 

GSP E – Harlaxton 2019 April Final Charges

Download

Download 

GSP F – Harlaxton 2019 April Final Charges

Download

Download 

GSP G – Harlaxton 2019 April Final Charges

Download

Download 

GSP H – Harlaxton 2019 April Final Charges

Download

Download 

GSP J – Harlaxton 2019 April Final Charges

Download

Download 

GSP K – Harlaxton 2019 April Final Charges

Download

Download 

GSP L – Harlaxton 2019 April Final Charges

Download

Download 

GSP M – Harlaxton 2019 April Final Charges

Download

Download 

GSP N – Harlaxton 2019 April Final Charges

Download

Download 

GSP P – Harlaxton 2019 April Final Charges

Download

Download 
Harlaxton Use of System Charging Statement- 1st April 2018 – Final

Download

Download 

GSP A – Harlaxton 2018 April Final Charges

Download

Download 

GSP B – Harlaxton 2018 April Final Charges

Download

Download 

GSP C – Harlaxton 2018 April Final Charges

Download

Download 

GSP D – Harlaxton 2018 April Final Charges

Download

Download 

GSP E – Harlaxton 2018 April Final Charges

Download

Download 

GSP F – Harlaxton 2018 April Final Charges

Download

Download 

GSP G – Harlaxton 2018 April Final Charges

Download

Download 

GSP H – Harlaxton 2018 April Final Charges

Download

Download 

GSP J – Harlaxton 2018 April Final Charges

Download

Download 

GSP K – Harlaxton 2018 April Final Charges

Download

Download 

GSP L – Harlaxton 2018 April Final Charges

Download

Download 

GSP M – Harlaxton 2018 April Final Charges

Download

Download 

GSP N – Harlaxton 2018 April Final Charges

Download

Download 

GSP P – Harlaxton 2018 April Final Charges

Download

Download 
Harlaxton Use of System Charging Statement- 1st April 2017 – Final

Download >>

Download 

GSP A  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP B  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP C  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP D  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP E  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP F  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP G  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP H  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP J  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP K  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP L  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP M  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP N  – Harlaxton 2017 April Final Charges

Download >>

Download 

GSP P  – Harlaxton 2017 April Final Charges

Download >>

Download 
Harlaxton Use of System Charging Statement- 1st April 2016 – Final

Download >>

Download 

GSP A  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP B  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP C  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP D  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP E  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP F  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP G  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP H  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP J  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP K  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP L  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP M  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP N  – Harlaxton 2016 April Final Charges

Download >>

Download 

GSP P  – Harlaxton 2016 April Final Charges

Download >>

Download 
Harlaxton Use of System Charging Statement- 1st October 2015 – Final

Download >>

Download 

GSP A  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP B  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP C  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP D  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP E  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP F  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP G  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP H  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP J  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP K  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP L  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP M  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP N  – Harlaxton 2015 October Final Charges

Download >>

Download 

GSP P  – Harlaxton 2015 October Final Charges

Download >>

Download 
Harlaxton Use of System Charging Statement- 1st April 2015 – Final

Download >>

Download 

GSP A  – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP B  – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP C  – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP D  – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP E  – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP F  – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP G  – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP H  – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP  J – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP  K – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP  L – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP  M – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP  N – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

GSP  P – Harlaxton 2015 Final Schedule of Charges

Download >>

Download 

Use of System Charging Statement – Final – April 2014

Download >>

Download 

Harlaxton 2014 Final Schedule GSP A

Download >>

Download 

Harlaxton 2014 Final Schedule GSP B

Download >>

Download 

Harlaxton 2014 Final Schedule GSP C

Download >>

Download 

Harlaxton 2014 Final Schedule GSP D

Download >>

Download 

Harlaxton 2014 Final Schedule GSP E

Download >>

Download 

Harlaxton 2014 Final Schedule GSP F

Download >>

Download 

Harlaxton 2014 Final Schedule GSP G

Download >>

Download 

Harlaxton 2014 Final Schedule GSP H

Download >>

Download 

Harlaxton 2014 Final Schedule GSP J

Download >>

Download 

Harlaxton 2014 Final Schedule GSP K

Download >>

Download 

Harlaxton 2014 Final Schedule GSP L

Download >>

Download 

Harlaxton 2014 Final Schedule GSP M

Download >>

Download 

Harlaxton 2014 Final Schedule GSP N

Download >>

Download 

Harlaxton 2014 Final Schedule GSP P

Download >>

Useful Links

Distribution Connection and Use of System Agreement

The Distribution Connection and Use of System Agreement (DCUSA) was established in October 2006 as a multi-party contract between the licensed electricity distributors, suppliers and generators of Great Britain. It is concerned with the use of the electricity distribution systems to transport electricity to or from connections to them. The DCUSA replaced numerous bi-lateral contracts, giving a common and consistent approach to the relationships between these parties in the electricity industry.

Website: http://www.dcusa.co.uk

Balancing and Settlement Code

The Balancing and Settlement Code (BSC) sets out the rules and governance arrangements for the balancing mechanism and imbalance settlement processes which were established under the new arrangements to ensure that supply and demand for electricity is balanced and that subsequent payments are reconciled. ELEXON supports the BSC Panel in supervising the operation of the BSC.

Website: http://www.elexon.co.uk

Master Registration Agreement

The Master Registration Agreement (MRA) sets out the inter-operational arrangements that support the processes for the registration of a change of electricity supplier in the UK retail market.

Website: http://mrasco.com/

National Terms of Connection

The electricity you receive from your electricity supplier will be delivered using the distribution system owned or operated by your electricity network operator. Your electricity supplier has been appointed as the agent of your electricity network operator to obtain a connection agreement with you on the national terms of connection. This means that, when you enter into your electricity supply contract with your supplier, you are also entering into a connection agreement with your electricity network operator on these terms.

Website: http://www.connectionterms.co.uk

Ofgem

Ofgem is the Office of Gas and Electricity Markets. They are a non-ministerial government department and an independent National Regulatory Authority, recognised by EU Directives.

Their principal objective is to protect the interests of existing and future electricity and gas consumers. They work to ensure Britain’s electricity wholesale and retail markets are competitive and regulate the natural monopolies that exist in distribution and transmission networks. They also manage the commercial tender process and operational framework for offshore transmission projects.

Website: https://www.ofgem.gov.uk

Harlaxton Engineering Services Limited

Harlaxton Engineering Services are specialists in multi utility supply, providing a comprehensive range of services that cover every aspect of design, supply, construction, connections, servicing and maintenance.

www.harlaxton.com

This will be replaced with the Google Map.

Contact Us

Your Name

Your Email

Subject

Your Message

Harlaxton Energy Networks Ltd

  • Toll Bar Road, Marston, Grantham, Lincs, NG32 2HT
  • 0844 8001 813
    Calls cost 7p plus your phone company’s access charge.
  • info@harlaxtonenergynetworks.com
Fax: +44 (0)800 055 6288

At Harlaxton Energy Networks Limited, we are committed to providing you with excellent customer service and we encourage feedback so that we may ensure we are making our customers happy.
If you have any comments or a complaint about our service please contact our customer service team.

Our normal hours of service are between 8am and 6pm Monday to Friday.

For any emergencies, please call our free 24hr Telephone Number: +44 (0)800 055 6288

Testimonials

Staples Vegetables Ltd

“Harlaxton saved us a lot of time and money when we need our system upgraded. They took charge of the whole project, negotiated lower connection charges and did everything from design to commissioning of our new anaerobic digester scheme. Would recommend without hesitation.”

Veron Read
Staples Vegetables Ltd

Company Name
2014-09-01T09:03:19+00:00

Veron Read
Staples Vegetables Ltd

“Harlaxton saved us a lot of time and money when we need our system upgraded. They took charge of the whole project, negotiated lower connection charges and did everything from design to commissioning of our new anaerobic digester scheme. Would recommend without hesitation.”

Alectron Investments

“Our requirements to deliver multiple HV connections on various DNO networks within exacting timescales (and to tight budgets) required a best of class provider. Harlaxton Engineering Services delivered!”

“We selected them for their ability to find economic solutions that work for all parties and deliver on time.”

“Even though our timescales became tighter, Harlaxton delivered on time and under budget – significantly contributing to the success of our projects.”
Gary Margerrison
Gary Margerrison

Gary Margerrison
Commercial Director
Alectron Investments

Company Name
2014-09-01T08:46:49+00:00
Gary Margerrison
Gary Margerrison

Gary Margerrison
Commercial Director
Alectron Investments

“Our requirements to deliver multiple HV connections on various DNO networks within exacting timescales (and to tight budgets) required a best of class provider. Harlaxton Engineering Services delivered!” “We selected them for their ability to find economic solutions that work for all parties and deliver on time.” “Even though our timescales became tighter, Harlaxton delivered View Full →

Aggregate Industries

“I only have praise for Harlaxton when it comes to customer service. Their 24 hour call out service is excellent, and whatever technical advice that’s needed they have the people who can provide it in a friendly and understandable manner.”

Andy Meadows
Aggregate Industries

“I only have praise for Harlaxton when it comes to customer service. Their 24 hour call out service is excellent, and whatever technical advice that’s needed they have the people who can provide it in a friendly and understandable manner.” - See more at: http://www.harlaxton.com/testimonial/aggregate-industries/#sthash.xGNB7ZHi.dpuf
Company Name
2014-09-01T09:01:08+00:00

Andy Meadows
Aggregate Industries

“I only have praise for Harlaxton when it comes to customer service. Their 24 hour call out service is excellent, and whatever technical advice that’s needed they have the people who can provide it in a friendly and understandable manner.” - See more at: http://www.harlaxton.com/testimonial/aggregate-industries/#sthash.xGNB7ZHi.dpuf
“I only have praise for Harlaxton when it comes to customer service. Their 24 hour call out service is excellent, and whatever technical advice that’s needed they have the people who can provide it in a friendly and understandable manner.”

Westleigh

“Harlaxton worked on a number of housing development projects in the East Midlands for us, and delivered a first class service on time and on budget.”

“I was also impressed with their third party management and overall communication – and would recommend them to anybody who wants a project completed to a very high standard.”

Mark Rockly
Surveying Director
Westleigh

Company Name
2014-09-01T08:55:13+00:00

Mark Rockly
Surveying Director
Westleigh

“Harlaxton worked on a number of housing development projects in the East Midlands for us, and delivered a first class service on time and on budget.” “I was also impressed with their third party management and overall communication – and would recommend them to anybody who wants a project completed to a very high standard.”